Kalkandere Regulator and Yokuslu HEPP
Brief Description
Concrete-filled body regulator. Total length: 6,927m.
Energy tunnel: inside diameter of 4m; concrete coated
Approach tunnels: Total length of 1,337m, 5 tunnels.
Spilway, Surge tank, Water intake structure, Fish pass, manufacture and assembly of Penstock with 280m length.
Power plant: Installed capacity is 16,675 x 2 = 33.35 MW
Project Name | Construction of Kalkandere Regulator and Yokuslu HEPP |
Location | Kalkandere, Rize - Turkey |
Client | Akım Energy Production Industry and Trade Co. Inc. |
Date of Start | Decemeber 2008 |
Date of Completion | September 2010 |
Value | 36,800,000.- US $ (Based on unit prices of 2008) |
Constructor | Palet İnşaat A.Ş. |