Ekrek Irrigation

Brief Description

Construction of irrigation network and manufacture of associated artworks, covering 745 HA on the main channel, with 19,412m length of HDPE pipe laying.

Specifications:

  • Main Channel Length: 24.14 Km
  • Main Channel Excavation: 18.04 Km trapezoidal, concrete fill
  • Gallery Length: 1,870m of excavation, concrete filling and productions
  • Canal Siphon Structures: 680m and 480m with steep walls, other artworks

Project Name Bahcelik Project Koprubasi - Ekrek Irrigation Construction
Location Bunyan region, Kayseri - Turkey
Client State Hydraulics Department - XII. Regional Directorate
Date of Start March 2012
Target Date of Completion 1100 days, from start
Value 58,307,440 TL (33,318,540 USD)
Contractor Palet Construction